Equipment | Spud Barges - CSM Dog Bone
Specifications & Features
|
The barge was designed and built for the installation of 20 each, 1100 ton foundation frames (dog bones) for the seismic retrofit of the San Mateo Bridge. It was designed by Gloston and built by XKT Engineering in 1999. New ABS steel was used. The steel was coated. The barge is made up of two hulls 40'x 126'x 9' joined by an 10'x 18'x 102' box structure across the stern on top of the hulls. The interior of the box structure has been made into an office, warehouse, change, and lunch area. Because of the unique loading, the hulls are built much heavier than normal hulls of the same dimensions. Two very heavy box beams span between the hulls. The beams can be rolled to the sides, for the barge to be moved around a structure having up to a 21.5ft width. All equipment is located on the box structure off the deck. Even the bow anchor wires are run underdeck. With an overall width of 102ft, the barge is very stable.
|